As contract administrator we run the building contract on the client’s behalf: issuing instructions, certifying payments, managing change and keeping the record straight. It is the role that turns a signed contract into a project that finishes on the terms agreed.
Preparing the contract documents, checking the particulars and getting the contract executed before work starts.
Issuing instructions, pricing variations before they are built and keeping a running change log.
Assessing interim valuations and issuing payment certificates on time, in line with the contract and the Construction Act.
Assessing notices, extensions of time and loss and expense fairly and with a documented reason.
Practical completion, the defects period, the final certificate and release of retention.
Developers and private clients under a JCT or bespoke contract who need an independent administrator; architects who would rather not carry the CA role themselves; and clients whose current contract has drifted and needs bringing back under control.
One-off private houses, small and mid-size residential developments, sports facilities and light commercial fit-out, typically £300,000 to £10 million, under JCT Minor Works, Intermediate, Standard Building Contract and Design and Build, and under bespoke developer agreements.
Valuations need to be checked on site and instructions are best given face to face. Newbury puts us within reach of Reading, Basingstoke, Oxford, Winchester, Swindon and Guildford for regular site visits and progress meetings.
The CA administers the building contract between client and contractor: instructions, valuations and certificates, extensions of time, practical completion and the final certificate. The CA must act fairly between the parties when certifying, while being appointed by the client.
No, but they overlap. The CA is a contractual role; the QS is a cost role. Because we are quantity surveyors, valuations and variations under our contract administration are measured properly rather than accepted on trust.
Yes, and often is. Where the architect prefers to focus on design, or where the client wants cost and contract handled by one firm, we take the role.
We assess it against the contract: was notice given, is the cause a relevant event, what is the demonstrable effect on time and cost. The decision is documented so both parties understand the basis.
The JCT suite, including Minor Works, Intermediate, Standard Building Contract and Design and Build, and bespoke developer and subcontract forms.