Cost planning and construction estimating, from Newbury to nationwide

Every good decision on a construction project starts with a believable number. We prepare benchmarked viabilities, staged cost plans, estimates and bills of quantities measured from drawings, for developers, contractors and consultants across the UK.

§01 / SCOPE 5 ITEMS

What the service involves

S/01
Early viability and benchmarking

Order-of-cost estimates tested against our database of priced schemes, so a site can be appraised before design fees are spent.

S/02
Elemental cost plans

Cost plans at each design stage, tracking the budget as the scheme develops and flagging drift early.

S/03
Value engineering

Options priced so the design team can choose with the cost consequence in front of them.

S/04
Estimating for contractors

Tender estimates and first-principles pricing for main contractors and subcontractors, from drawings and specifications.

S/05
Bills of quantities

Measured bills and schedules of works for tender, so contractors price the same thing and returns compare like for like.

§02 / CLIENTS AND OUTPUT

Who it is for

Developers appraising land or testing a scheme; contractors and subcontractors who need overflow estimating capacity at tender; architects who want a cost plan alongside a design; and private clients who want to know what a project will cost before committing.

What you get

  • A measured estimate with the quantities and rates shown, not a lump sum
  • Benchmarks against comparable priced schemes
  • A cost plan that is updated as the design moves
  • Fast turnaround on tender estimates, with a clear list of assumptions and exclusions
§03 / PROJECTS AND AREA

Typical projects

Residential schemes from single houses to several hundred plots, apartment buildings, sports and leisure facilities, education and light commercial. Our priced work covers more than 250 projects and £150 million of construction value over the last two years.

Local knowledge, national reach

Cost planning is strongest when it is grounded in local rates and we know the Berkshire, Hampshire and Thames Valley market well. Estimating and bills of quantities are produced entirely from drawings, so we take that work on for clients anywhere in the UK.

SEE THE AREAS WE SERVE →

§04 / QUERIES 5 ITEMS

Frequently asked questions

What is the difference between an estimate and a cost plan?

An estimate is a single view of cost at a point in time. A cost plan is a living document that starts as an order-of-cost estimate, becomes elemental as the design develops and is reconciled at each stage, so the client always knows where the budget sits.

How accurate is an early cost estimate?

At feasibility, with a site plan and accommodation schedule, an estimate is typically within 10 to 15 per cent. Accuracy tightens as the design is fixed. We always state the assumptions and the level of design information the figure is based on.

Can you produce a bill of quantities from my drawings?

Yes. Send the drawings and specification and we will measure a bill or schedule of works for tender. This is available nationwide because it does not require site attendance.

Do you provide estimating for contractors?

Yes. We support main contractors and subcontractors at tender with first-principles pricing and measured take-offs, either for individual bids or as ongoing overflow capacity.

How quickly can you turn an estimate around?

It depends on the size and the information available. Single houses and small schemes are usually a matter of days; larger tenders are programmed to the bid deadline. Tell us the date and we will confirm whether it is achievable.

§05 / RELATED SERVICES 3 ITEMS
SRV-01 QUANTITY SURVEYING READ MORE → SRV-07 JCT CONTRACT ADVICE READ MORE → SRV-06 FINAL ACCOUNTS READ MORE →